Pennsylvania Awards $37 Million for 515 EV Charging Ports
Pennsylvania’s latest federal charging awards target 515 ports around Philadelphia, including curbside plugs for drivers who park near home.
The short answer: Pennsylvania is directing $37 million in federal funding to projects expected to add 515 public EV charging ports across five Philadelphia-area counties. The awards include curbside Level 2 charging and DC fast charging, but the ports are not open yet.
Pennsylvania is directing $37 million in federal funding toward 515 new public EV charging ports across the Philadelphia region, according to Electrek. The awards cover Bucks, Chester, Delaware, Montgomery and Philadelphia counties, with projects ranging from curbside plugs to DC fast chargers. For EV buyers who cannot charge in a driveway, the curbside projects could make it easier to plug in while parked near home. The funding is an award for future construction, however: drivers will have to wait for the sites to be built and commissioned before they can use them.
PennDOT expects the projects to increase public charging availability by 27% across the five-county region and by 53% in Philadelphia, Electrek reports. Those figures describe the agency’s expected expansion from the awarded projects, rather than chargers already available to drivers. The distinction matters for anyone weighing an EV purchase around where they can charge today. The projects point to a larger local network, but an award does not yet identify an open port on a driver’s route or near their home.
Where the charging awards are going
Part of the round focuses on on-street charging in Philadelphia. According to Electrek, It’s Electric PA received $2.93 million for 157 Level 2 ports across 13 neighborhoods. Level 2 charging serves a different parking pattern from a highway fast-charging stop: the Philadelphia ports are intended for people who can leave a vehicle parked near home while it charges. Their placement is particularly relevant to residents without private driveways, though the awards do not mean that any particular block has a working charger yet.
The curbside approach also extends beyond city limits. Electrek reports that Voltpost received funding for another 62 curbside ports across Bucks, Chester, Delaware and Montgomery counties. Taken together, the Philadelphia and suburban projects account for 219 announced curbside ports. The five-county scope means the round addresses charging access in both the city and its surrounding communities. The report does not give an opening date for those ports, so their practical value to drivers will depend on when construction and commissioning are finished.
Fast charging is another part of the awards. PositivEnergy received $7.2 million for 54 DC fast-charging ports at 11 Philadelphia Parking Authority lots, according to Electrek. Unlike the curbside Level 2 projects, these ports are designated as DC fast charging. The parking-lot sites add a different kind of public charging location within Philadelphia, where drivers may be looking for a charging session away from their usual overnight parking place. The award identifies the number of ports and sites, but does not establish that the locations are ready for use.
Tesla also received two $392,000 awards, Electrek reports. Each covers eight ports: one project is at Royal Farms in Broomall and the other is at Wawa in Plymouth Meeting. That makes 16 ports across the two sites. The awards show that the round includes projects at retail locations as well as curbside locations and public parking lots. PennDOT’s program requirements address connector access, but the report does not give connector details for these two projects, so buyers should not assume a particular vehicle can use them before site details are published.
Electrek says PennDOT made 71 awards in this southeastern round as part of a community charging effort of roughly $100 million statewide. The named curbside, parking-lot and retail projects illustrate how that round spans different locations and charging needs; they are only part of the reported 515-port total. The $37 million figure is the federal funding directed toward this regional round, while the roughly $100 million figure describes the broader statewide community effort. They refer to different scopes of the program.
How Pennsylvania reached this stage
The money comes from the federal National Electric Vehicle Infrastructure program, known as NEVI, which was created by the Biden administration’s Bipartisan Infrastructure Law. Pennsylvania has a five-year NEVI allocation of $171.5 million, according to Electrek. NEVI initially focused on fast charging along designated highway corridors. That emphasis addresses travel between places, but it does not by itself put a plug near every apartment, row house or other home without private parking. The southeastern awards illustrate how the program can also support charging within communities.
States can use NEVI funding more broadly after the Federal Highway Administration certifies that they have met their corridor charging requirements. Pennsylvania received that certification on September 22, 2025, Electrek reports. The certification helps explain why this round can fund Level 2 curbside ports as well as DC fast chargers. For drivers, those two types of project address different situations: a place to charge while parked near home and a place to use faster charging away from home. Both still depend on the awarded projects reaching operation.
According to Electrek, Pennsylvania has built 54 EV charging stations with NEVI funds so far, more than twice the number of any other state. That is a count of stations already built under the program, separate from the 515 ports covered by the new southeastern awards. It also uses a different unit: a station can have multiple ports. Reading the two figures separately gives a clearer picture of the program’s progress. Pennsylvania has completed NEVI-funded stations, while this latest round sets out additional ports that remain to be delivered.
PennDOT’s community charging program supports both Level 2 and DC fast charging, Electrek reports. Its published minimum requirements call for at least four ports at each proposed station, at least 6 kW per port, two parking spaces compliant with the Americans with Disabilities Act, and a J1772 or CCS connector on every port. Equipment must also meet Buy America requirements. These are program minimums, not the charging speeds or complete site designs for every award. A buyer comparing future locations would still need the details of each finished station.
What happens before drivers can plug in
The next steps begin with project review and agreements. For the southeastern awards, PennDOT’s estimated schedule places environmental reviews from November 2026 through January 2027, followed by agreement execution in January and February, according to Electrek. Construction and commissioning come after the awards become projects ready to build and operate. The schedule therefore describes administrative milestones, not a date when 515 ports will all be available. Anyone checking local charging options should distinguish the newly announced awards from Pennsylvania’s existing NEVI-funded stations.
More applications are also on the calendar. Electrek reports that applications for western Pennsylvania close November 20, while those for central and eastern Pennsylvania close March 12, 2027. Those deadlines concern other parts of the statewide community charging effort; they do not change the status of the southeastern projects already awarded. The regional round’s impact will become concrete as its curbside chargers, parking-lot fast chargers and retail-site ports move through review, construction and commissioning. Until then, PennDOT’s projected increase in charging availability remains a forecast tied to completing the work.
Frequently asked questions
How many EV charging ports are covered by Pennsylvania’s latest awards?
According to Electrek, $37 million in federal funding is going toward 515 public ports across five Philadelphia-area counties.
Will the awards include curbside charging?
Yes. Electrek reports awards for 157 on-street Level 2 ports in Philadelphia and another 62 curbside ports in four surrounding counties.
Are the newly funded chargers open?
No opening date was reported. PennDOT’s estimated schedule includes environmental reviews from November 2026 through January 2027, followed by agreements; construction and commissioning are still needed.
Why can Pennsylvania fund community chargers through NEVI?
States can spend NEVI funds more broadly after federal certification that their highway corridor charging requirements are met. According to Electrek, Pennsylvania received that certification on September 22, 2025.
Related stories
How to Choose an EV for Frequent Public AC Charging
If you often charge at public AC stations, compare the car’s onboard charger, connector access and how long it will usually be parked there.
How to Build a Flexible EV Charging Routine for Work
Build charging around the miles you need for your next drive, using home, work, or public charging as your schedule allows. Keep a practical buffer.
Kansas Has the Lowest Average Public EV Charging Cost
Kansas had the lowest average public EV charging rate in late November, while Hawaii had the highest, highlighting wide state differences and pricing hurdles.


